Josh, McWane, and Shannon talked about the energy consumption audit, then headed to meet Walley. After talking to Walley about the Photovoltaic system they left and headed back to the apartment. At 2pm McWane, Josh, and Mercedes headed to the colonia to do surveys on 8 different houses. They completed surveys on houses #10, 11, 12, 13, 14, 15, 16, and 17. Shown below is house #10 at the top of one of the ridges in the colonia.
After doing surveys at each these houses we moved on to collect trash from houses #3, 4, and 5. Upon return to the apartment, McWane started searching through trash for houses #3, 4, and 5. Below is house #3.
The results from this trash assessment are shown below.
Overall Weight (Ibs) | Paper (Ib) | Metal (Ib) | Food Waste (Ib) | Glass | Biological | Styrofoam |
15.25 | 0.68 | 0.43 | 5 | 1.875 | 0.9 | 0.1875 |
Plastic (Ib) | Rubber/Leather | Textile | Wood/Yard |
2 | 0.406 | 0.375 | 3.4 |
No comments:
Post a Comment